Garth Worthington school is a LEED Silver, 900 student capacity K-9 school that was delivered through IPD. This project was delivered on time and well under budget through the peak of the Covid-19 pandemic. The team pivoted quickly and adjusted to continue working with only ten days in total disruption due to Covid. We were able to fund the entire project team wish list of additional project items. We were excited to deliver this project with our project partners EPSB, Group 2, Chandos, WSP, MCW, Entuitive, ICON, Collins, Baytek and RGO. Alta Pro Solar department also installed a 256-kw solar array on the roof which provides the equivalent of over 330 Acres of US forest in carbon emission reductions.
The Expo center rehabilitation project is the first IPD project for the City of Edmonton. We are proud to be leading members on the inaugural city IPD project. We will be replacing the aged mechanical systems, electrical systems, and roof systems throughout the 42-year-old areas of the building. On top of it all (literally) will be the largest rooftop solar array in Canda at 2.8 MW in size. The Expo Epic team includes The City of Edmonton, Eco Ammo, ACI Architects, Arc Studios, Delnor, SMP, Engspire, Cima+, Icon, Collins, and AltaPro.
Canada Games Aquatic Center
Project Value: $14M
Canada Games Aquatic Center needed a facelift and the town of Kamloops wisely chose to use the IPD model to do it. The team replaced distribution, lighting, paging and various other electrical equipment, pool equipment, mechanical equipment, renovated the pool area and validated designs for future expansion and renovation of the facility. This was another facility and project that was completed through the peak of Covid- 19 pandemic yet the team was able to keep that in stride and mitigate multiple risks to keep the project on time and under budget.
Previous
Next
St. Patrick's Community School
Project Value: $15M
St Pat’s project was a unique addition and modernization of the entire school all while managing the construction in conjunction with an occupied school of elementary students. The team worked hard to mitigate most of the risks that typically come along with a renovation and brought the project in under budget and ahead of schedule. This included a 124kw rooftop array and a 16 KW dual axis motorized solar tracker that has amazing production values. Partnering for this project with RDCRS, Chandos, Group2.
EPSB Solar Initiative Phase ll
Project Value: $6M
The first of its kind, Edmonton Public Schools saw an opportunity to deliver a multi-project program delivered through IPD to maximize the potential of the possible 15-18 school sites with a target of just over 3 MW of total solar modules installed across multiple locations. By keeping the team small with only EPSB, AltaPro and WSP Structural engineering, and Larsen electrical engineering, we can keep the overhead costs low while still delivering an IPD environment and maximize the value back into the projects. Our team is proud to be able to deliver this group of projects in an innovative way and expect excellent results for EPSB.
Strathcona County Indoor Field House
Kamloops RCMP Station
Sakaw Terrace Seniors Housing
St. Lorenzo Ruiz School
Thelma Chalifoux School
Soraya Hafez School
Millcreek School
Groupe Nordik Village
Okotoks Arts & Learning Campus
Drayton Valley Aquatic Centre
Mixed Use live/work building net zero
Blackmud Village design
Artists Quarters
Indoor Grow Facility
Squamish Tantalus Fire Hall
Project Value
$90M
TBA - In Validation
$40M
$26.5M
$27M
$14.5M
$11M
TBA – On Hold (Covid) In Validation
$23M
$22M (In Construction)
Validation only – Approx. 1.2M, 2019
Validation only – Approx. 1.9M, 2017
Validation only – Approx. 2.9M 2016
TBA - In Validation
Approx. $14M
Project Name - Project Value
Strathcona County Indoor Field House - $90M
Kamloops RCMP Station - TBA
Sakaw Terrace Seniors Housing - $40M
St. Lorenzo Ruiz School - $26.5M
Thelma Chalifoux School - $27M
Soraya Hafez School - $14.5M
Millcreek School - $11M
Groupe Nordik Village - TBA - On Hold
Okotoks Arts & Learning Campus - $23M
Drayton Valley Aquatic Centre - $22M
Mixed Use live/work building net zero - Validation only - Approx. 1.2M
Blackmud Village design - Validation only - Approx.1.9M. 2017
Artists Quarters - Validation only - Approx. 2.9M, 2016