Project Value: $26M
Take a look at one of our IPD Projects: Garth Worthington school is a LEED Silver, 900 student capacity K-9 school that was delivered through IPD. This project was delivered on time and well under budget through the peak of the Covid-19 pandemic. The team pivoted quickly and adjusted to continue working with only ten days in total disruption due to Covid. We were able to fund the entire project team wish list of additional project items. We were excited to deliver this project with our project partners EPSB, Group 2, Chandos, WSP, MCW, Entuitive, ICON, Collins, Baytek and RGO. Alta Pro Solar department also installed a 256-kw solar array on the roof which provides the equivalent of over 330 Acres of US forest in carbon emission reductions.
Project Value: $98M
The Expo center rehabilitation project is one of our first IPD projects for the City of Edmonton. We are proud to be leading members on the inaugural city IPD project. We will be replacing the aged mechanical systems, electrical systems, and roof systems throughout the 42-year-old areas of the building. On top of it all (literally) will be the largest rooftop solar array in Canda at 2.8 MW in size. The Expo Epic team includes The City of Edmonton, Eco Ammo, ACI Architects, Arc Studios, Delnor, SMP, Engspire, Cima+, Icon, Collins, and AltaPro.
Project Value: $14M
Canada Games Aquatic Center needed a facelift and the town of Kamloops wisely chose to use the IPD model to do it. The team replaced distribution, lighting, paging and various other electrical equipment, pool equipment, mechanical equipment, renovated the pool area and validated designs for future expansion and renovation of the facility. This was another one of our IPD Projects that was completed through the peak of Covid- 19 pandemic yet the team was able to keep that in stride and mitigate multiple risks to keep the project on time and under budget.
Project Value: $15M
St Pat’s project was a unique addition and modernization of the entire school all while managing the construction in conjunction with an occupied school of elementary students. The team worked hard to mitigate most of the risks that typically come along with a renovation and brought the project in under budget and ahead of schedule. This included a 124kw rooftop array and a 16 KW dual axis motorized solar tracker that has amazing production values. Partnering for this project with RDCRS, Chandos, Group2.
Project Value: $6M
The first of its kind, Edmonton Public Schools saw an opportunity to deliver a multi-project program delivered through IPD to maximize the potential of the possible 15-18 school sites with a target of just over 3 MW of total solar modules installed across multiple locations. By keeping the team small with only EPSB, AltaPro and WSP Structural engineering, and Larsen electrical engineering, we can keep the overhead costs low while still delivering an IPD environment and maximize the value back into the projects. Our team is proud to be able to deliver this group of projects in an innovative way and expect excellent results for EPSB.